Shoring (Soil retention system) plays the most important role in any deep excavation or basement construction & can be formed using one of the following techniques. The selection of the right system is generally governed by the soil strata, the size of the available area for the site set up, the water table, the depth of the excavation the surroundings, and obviously the economical factor. The dedicated team of VIDSON is specialized to do Design & Construct for following type of shoring work:

  • Diaphragm wall (DW) with concrete panels - With a Hydraulic or Mechanical Grab.

  • Secant Pile Wall (SPW) - With a Hydraulic piling machine.

  • Contiguous Pile Wall (CPW) - With a Hydraulic piling machine.

  • Sheet pile wall - With a crane and a vibro hammer